To proceed to the disposal of the line follow the following steps :

  1. Disconnect electric supply;
  2. Disconnect LAN connection;
  3. Disconnect water supply;
  4. Disconnect compressed air supply.


Execution of these operations must be done by Level 1 Qualification staff.